Case Details

post22
Reducing Load Shedding Stress and Energy Costs
Objective:

To lower operational costs and improve sustainability across their factory operations.

Challenge:

The company faced high daytime energy consumption due to heavy machinery and wanted a system that would reduce energy costs without downtime.

Our Solution:

✅Installed a 50kW grid-tied solar system across the factory roof using premium JA Solar panels and Huawei inverters.

✅Conducted a full load analysis to optimize system output and align peak generation with production hours.

✅Integrated with existing three-phase power for seamless operation.

Results:

✅ Electricity costs cut by 60% monthly.

✅Reduced carbon footprint by over 35 tons of CO₂ annually.

✅Achieved ROI in just 3.5 years.

Client Testimonial

Project Information

Client Name:
Midas Engineering (Pty) Ltd
System Type
50kW Grid-Tied Commercial System
image6
Solar Solutions
Need Help? Call Us Now
082 863 9041
Cart (0 items)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare